Our Latest Posts
April 2018 - The Control Room
The control room in preparation for a fresh lick of paint. Monitoring and controlling of the works will take place either from this room or our base at Brickfield House once the works is operational.
04 May 2018
March 2018 - Inside the High Lift Pump House
The high lift pump house is a hive of activity at the moment with Nick and Phil busy working on the installation of the high lift pump pipe work.
12 Apr 2018
March 2018 - Poly Chemical Dosing Pumps
The chemical dosing pumps for Poly electrolyte (the flocculent aid) now fitted into their final position.
March 2018 - Chemical Dosing Pumps
The chemical dosing pumps for Sodium Hypochlorite (chlorine) now fitted into their final position.